News

2016

Markedslabben solves wind farm layout challenge using FICO Optimization

WindFarmDesigns (Markedslabben AS) was awarded the FICO Decisions Award for Analytic Excellence. Using the FICO® Xpress Optimization Suite, we developed a wind farm layout optimization algorithm that — uniquely — integrates turbine load constraints directly into the optimization problem, rather than checking and adjusting layouts manually afterwards. The result is a 2–5% improvement in energy yield and a corresponding gain in project profitability. Applied across the ~50 GW of new wind capacity added globally each year, that improvement would cut CO₂ emissions by an estimated 2–5 million metric tons annually where wind replaces coal.

Read the FICO newsroom article

IEC-compliant optimized wind farm layout

2019

WindFarmDesigns in the Van Oord Innovation Challenge

Van Oord is a leading global maritime contractor specialising in dredging, oil & gas infrastructure and offshore wind — driven by what they call “Marine ingenuity.” WindFarmDesigns was selected as one of the start-ups in the Van Oord Offshore Wind Innovation Challenge.

Layout optimization is just as relevant offshore as on land — but the dominant cost driver shifts. Offshore, varying seabed conditions (water depth, soil type and foundation requirements) make some positions far more expensive to build than others. Optimal turbine placement therefore has to weigh energy yield against site-specific foundation cost — exactly the kind of constraint-aware optimization WindFarmDesigns was built for.

Read about the Van Oord Innovation Challenge

Van Oord offshore wind
© Copyright - WindFarmDesigns